NAPS2 Infill Project

E-mail

Client  BHP Billiton Iron Orenaps
Location  Newman, WA
Start Date  March 2008
End Date  Current
Value $18M

The project involved upgrading 36 existing housing lots (scattered through the Newman townsite) and converting them by subdivision and improvement works into 138 new housing sites upon which will be located a transportable home with appropriate landscaping.

The works include:

  • Survey and setting out
  • Clearing, grubbing, stockpiling and removing all cleared material
  • Stripping, stockpiling and re-spreading topsoil
  • Embankment construction
  • Bulk earthworks
  • Roadworks
  • Services installation
  • Retaining Walls
  • Underground electrical reticulation
  • Quality assurance and testing
  • Carparks
  • Culverts and drainage structures
  • Detailed earthworks
  • Road formation
  • Sewer and water reticulation
  • Stakeholder engagement
  • Traffic management