Delivering civil construction and mining services solutions with certainty








Client Newcrest Mining Limited 
Location Telfer, WA
Start Date September 2003
End Date June 2006
Value $60M+
Brierty Contractors was initially contracted in September 2003 to provide stabilisation to 84 floodways of the Telfer Access Road. Newcrest Mining opted to engage Brierty Contractors as its major civil contractor for the infrastructure upgrade.
Works at Telfer comprised of:
Works were completed on the huge tailings dam and civil activities were scaling down when the cyclone moved crossed the Pilbara. Flooding devastated the 140km road preventing access into Telfer. With no other route into the minesite, delivery trucks queued at the edge of what had become an enormous lake up to a metre in depth. Over 25kms of this vital link was under water and the Brierty Contractors’ construction team worked long hours with Newcrest Mining to bridge the road.
This required large amounts of imported material being placed in the water to provide a platform. It was not possible to build a trafficable road in the short term and delivery trucks were towed through the water logged desert using earthmoving equipment. The problem was exacerbated by lack of natural drainage and it took some months for floodwaters to subside through evaporation and soakage. Operations were constantly hampered by further rainfall providing Telfer with its wettest winter in history.