Telfer Treatment Ponds

Client Newcrest Mining Limited 
Location Telfer, WA
Start Date March 2006
End Date September 2006
Value $0.5M
Civil works associated with the Telfer Treatment Ponds including:
- Clearing and topsoil stripping
- Load and haul of borrow material for embankment earthworks
- Construction of a new lined primary treatment pond
- Construction of a new unlined evaporation pond
- Diversion drains
- Raising and trimming of the existing embankments to defined levels
- Placement of gravel sheeting to the new and existing embankments
- Removal of existing perimeter fencing to the east side of the existing ponds
- Construction of a new fence to match existing
- Supplying of all as-constructed records for the project
- Management of construction sequences, pond water levels and bypass flows