Telfer Treatment Ponds

E-mail

Client Newcrest Mining Limited telfer-ponds
Location   Telfer, WA
Start Date   March 2006
End Date   September 2006
Value  $0.5M

Civil works associated with the Telfer Treatment Ponds including: 

  • Clearing and topsoil stripping
  • Load and haul of borrow material for embankment earthworks
  • Construction of a new lined primary treatment pond
  • Construction of a new unlined evaporation pond
  • Diversion drains
  • Raising and trimming of the existing embankments to defined levels
  • Placement of gravel sheeting to the new and existing embankments
  • Removal of existing perimeter fencing to the east side of the existing ponds
  • Construction of a new fence to match existing
  • Supplying of all as-constructed records for the project
  • Management of construction sequences, pond water levels and bypass flows