Client: Newcrest Mining Limited 
Location: Telfer, WA
Start Date: May 2006
End Date: June 2006
Value: $2.2M
This project involved the construction of an underground haul road approximately 1700m in length. The road works were constructed from the vicinity of sump 2 located on the 4475 level to the crusher station located at the shaft area on the same level. The area in which the road was construction had varying gradients of 2% with the size of the underground excavation of approximately 6.3m wide to 5.8 high.
The construction methodology was as follows: