Quinns Road Bridge

E-mail

Client Public Transport Authority of WAquinns
Location
Perth, WA
Start Date August 2003
End Date May 2004
Value $3.5M

The project scope included the investigation, design and construction of:

  • Approximately 1km of Quinns Road as two lane single carriageway, including an at-grade intersections at Hidden Valley Retreat, Nowergup Depot Access Road and RCG Quarry Access Road
  • A single carriageway to be northern (eastbound) carriageway of future Quinns Road dual carriageway
  • Quinns Road bridge over the Northern Suburbs Transit System railway. The bridge was a single span bridge, over two tracks, of concrete and steel construction
  • All connections, modifications and improvements necessary to connecting roads and intersections including Hidden Valley Retreat, Nowergup Depot Access Road and RCG Quarry Access Road

The projects works included:

  • Earthworks
  • Asphalt surfacing
  • Railway formation
  • Drainage
  • Retaining walls and structures
  • Fencing
  • Dual use paths
  • Lighting;
  • Signing and pavement marking;
  • Services
  • Landscaping